Welcome: Shanghai Suren Machinery Manufacturing Co., Ltd.
Language: Chinese ∷  English

Company new

Set-up machine installation - safety requirements - Shanghai Su Ren

  1. The sleeve labeling machine arrives at the scene. Before installation, the damage inspection must be carried out to check whether the frame is deformed. The electrical cabinet is not damp, especially if all parts are inspected for damage (such as collision marks).

   2. When the device is not fully positioned, please do not remove the package. You can use the forklift to carry it. Please insert it from the bottom of the front of the machine.

   3. Please do not cover the heat-dissipating fan of the obstruction or electrical cabinet to ensure good heat dissipation. Otherwise, the temperature of the electrical components will be too high, resulting in equipment damage and equipment stability.

   4. Confirm that the power supply meets the working power requirements of the device. If the voltage does not match, it may cause damage to the components of the electrical components.

  (This information is provided by Shanghai Suren Machinery Manufacturing Co., Ltd.)


CONTACT US

Contact: Wendy Jiang

Phone: 0086-13482266656

Tel: 0086-21-33657068

Email: sales03@sr-packing.com

Add: No. 18, Changting Road, Fengxian District, Shanghai, China